Pullman Paving Project
  • USDA

Pullman Paving Project

Location: Pullman, Washington

Agency: USDA – Agricultural Research Service

Contract ID: 12052118P0021

Verdis completed the subgrade preparation and installation of an asphalt pavement driveway and parking lot approximately 5,700 square feet in area at the USDA Agricultural Research Center in Pullman, Washington.  The new asphalt was coated with a slurry seal to extend the lift of the asphalt.  Three horizontal sliding warehouse doors were replaced with vertical roll up doors.  The existing wooden doors were becoming aged and difficult to operate.  The new vertical doors are metal and controlled by individual wall switches.  The door jambs in the warehouse were retrofitted to provide a weathertight seal around the new doorways.

Back to Federal Projects