• Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway
  • Kachess Spillway

Kachess Spillway Bridge Deck Replacement

Location: Easton, Washington
Agency:  United States Department of the Interior, Bureau of Reclamation
Contract ID:  R16PC00094

Verdis was the prime contractor on a concrete bridge deck replacement on the Kachess Dam Spillway. Work included the removal of the existing 11’ wide by 52’ long concrete bridge deck, salvaging and reinstalling the existing steel pipe railing and constructing a new cast-in-place concrete bridge deck.

Back to Federal Projects

Related Projects